Happy New Year Everyone - enjoy this month's updates!
New Contract with Verizon Fios
For the first time in our building's history, residents will have a choice of cable/internet/phone providers between Cablevision and Verizon Fios. We have entered into a contract with Verizon Fios to wire our building with their fiber-optic technology at no cost to us. The wiring will include new decorative crown-molding style cable track to cover our existing cablevision track and hide the new cable runs.
The work is expected to begin by February, though that can change at any time based on Verizon's work schedule.
We're happy to reduce the maintenance by a small amount
for 2010 as compared to 2009. The 2009 assessment has ended, and is being
replaced with a smaller assessment for 2010. Though our fixed costs continue to
rise each year, our recently completed energy-efficient lighting project is
saving our building $1,000 per month on electricity, and is largely responsible
for the small reduction in maintenance this year.
Three parking spots have become available within the past
few months, they have been assigned, and everyone else on the waiting list has
moved up three slots. Please check the building web site under Car Parking Waiting
List for updates on your wait list status.
Bicycle parking in the garage has been reduced to $5 per
month. If you would like to park up to two bikes on a bicycle rack, please let
the board know at board@616east18.com. If you already have a car parking spot,
you can request a bike rack for free to be installed in your spot.
A couple of gentle reminders
- Moving-in and moving-out is limited to weekdays between 8am and 5pm and must be done in accordance with house rule #10: "Trunks and heavy baggage and furniture shall be taken in or out of the building through the service entrance only after an appointment has been made with the superintendent." This is to allow the staff to protect the elevator walls and floor and to avoid bottlenecking our elevator during peak usage times.
- At the request of several residents, please remove laundry from machines within 10 minutes of the end of a cycle, or else another resident may remove your laundry to a folding table for you. Also thanks to the automatic motion sensor for the light in the laundry room, you no longer any need to remember to turn off the lights when leaving the laundry room.
Boiler Replacement Progress
The board has received and is reviewing quotes from four contractors for our upcoming boiler replacement project. Asbestos abatement
will be performed in the boiler room before the project begins, after this
heating season is over.
Fire Escape painting is now complete. Thank you to all of
our residents for cooperating and being patient while we found the right
contractor to complete the work properly.
Our bikes on the garage racks have really opened up our closets. It's also made it a lot easier getting in and out of the building without having to schlep the bike(s) via the elevator and backdoor. I highly recommend it especially at $5/month.