Building To Be Wired for Fios This Week

| | Comments (0) | TrackBacks (0)
As of Wednesday or Thursday of this week, (Mar 31 or Apr 1), Fios will begin installing their cables inside our building. There will be some drilling involved in this installation, but any drilling will be restricted to begin no earlier than 9am and on weekdays only. They will be working to run their cables inside their new crown-molding style cable-track on all 6 of our residential floors. This new style of track will obscure our view of the existing rectangular cablevision cable-track. They will also be working to run cables vertically through our building in the compactor rooms on each floor. If you have any questions for the board about or during this work, please e-mail board@616east18.com. The work should last about a week. No estimate yet on when you will be able to sign up for Fios. Stay tuned.

0 TrackBacks

Listed below are links to blogs that reference this entry: Building To Be Wired for Fios This Week.

TrackBack URL for this entry: http://www.616east18.com/cgi-bin/mt/mt-tb.cgi/56

Leave a comment


The opinions expressed here are those of the authors only. They do not necessarily reflect the positions or opinions of the 616 East 18 St. Owners Corporation, any of its staff members or residents, or Maxx Management.

This page contains a single entry by Andrew Merelis published on March 29, 2010 4:29 PM.

Utility Pole Installation was the previous entry in this blog.

Fios "Coring" To Begin in North Stairwell Tuesday is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.