Fios "Coring" To Begin in North Stairwell Tuesday

| | Comments (0) | TrackBacks (0)
Fios Update - Workers will be creating a pathway for their fiber optic cable beginning around 9am on Tuesday, April 6, 2010. This work will mostly take place in the stairwell closest to our elevator. Please use the other stairwell (or the elevator) if you see that work is being done. Signs and cones will be posted during the work. Some "coring" or drilling holes in the floor will be involved in this work to get the condit to run from the bottom to the top of our building. This new pipeline will be next to the existing pipeline that cablevision has in that stairwell.

0 TrackBacks

Listed below are links to blogs that reference this entry: Fios "Coring" To Begin in North Stairwell Tuesday.

TrackBack URL for this entry: http://www.616east18.com/cgi-bin/mt/mt-tb.cgi/57

Leave a comment


The opinions expressed here are those of the authors only. They do not necessarily reflect the positions or opinions of the 616 East 18 St. Owners Corporation, any of its staff members or residents, or Maxx Management.

This page contains a single entry by Andrew Merelis published on April 5, 2010 12:22 PM.

Building To Be Wired for Fios This Week was the previous entry in this blog.

Hallway Design (Variations A, B, C, D) is the next entry in this blog.