Fall 2010 Board Updates

| | Comments (1) | TrackBacks (0)

Boiler Project in Construction Phase

The building's original 1963 boiler has been dismantled and removed. The boiler room has been cleaned, prepped, and a new concrete base has been installed. The main steel pieces of our new boiler are already on site and will be put together this week. Adjustments have been made to our mobile boiler (on the street) so as to avoid the recent over-heating and subsequent under-heating. One of the best new features of our new boiler system will be wireless thermostats in select apartments that will, for the first time in our buildings' history, let the new boiler know the actual temperature INSIDE our building to determine how much heat to create. Our old boiler (and current mobile unit) only know the outside temperature, which is a far less efficient way of determining when to turn itself on and off. We are looking forward to the likely savings we will get from less oil usage by the new more efficient system. The board appreciates all of your patience during this construction.

 

Hallway Project Approaching Construction Phase 2

Our hallway design is about to go to construction. A contractor has been chosen, and they have been in our building many times over the past few weeks to work with us to flesh out the details of our existing design, which includes picking specific paint colors, molding shapes, taking measurements, and planning the project timing. We are about to order the carpet for the project, which has a 13-week lead time to be manufactured to our specifications. This means that hallway renovation construction will likely take place in or around March 2011. Apartment door exteriors will all be painted, and will need to be open during their painting and 6-hour drying. We will post schedules asking for your availability or permission to have your apartment doors open for long enough for the paint to dry properly. In addition, we will be swapping your main entry door external knobs and chime/viewers with brand new silver-colored ones to match the new silver door kick plates to be installed and chrome-rimmed lighting fixtures already installed during phase 1 last year.

 

Art Committee (Lobby Committe, see comments)--Coming Soon!

The board is planning to gather together a committee to take charge of improving our lobby (and stairwells) with various art projects, including a replacement of the large painting in our lobby sitting area. At this point, ideas of all types are being collected. So far, current ideas include temporary installations for artists within our community to compete for and win, to more permanent installations of neighborhood historic photos, local/building artist paintings, decorative framed mirrors, etc. We are even considering framing squares of our soon-to-be historic wallpaper somewhere in our building with plaques that read "1963-2011". If you have an idea to add, please e-mail it to board@616east18.com. If you would like to join this future committee, please let us know. Are you a photographer, painter, sculptor, designer? If you know of any affordable or discount resources that could help with this type of project, we are all ears. Let's get our collective creativity in gear while improving our public spaces.

 

Entire Board Attending CNYC Co-Op and Condo Housing Conference 2010

In what may be a world-record, your entire 5-member board of directors, including Leon, our Building/Property Manager, are ALL attending this year's annual CNYC Housing Conference, where they will be attending seminars all day (8:30am to 4:30pm) on topics relevant to our building such as "Planning Strategies for Redecorating Public Spaces," "Solving Noise Issues: Management Role," "A Green Roof for Your Building," "Plants that Thrive in an Urban Environment," "Your Roof and Exterior Walls," and "Property Tax Q&A." These seminars are extremely helpful in keeping our board up to date with the latest in building operation, management, upkeep, improvement, and relations. What's great about sending such a large group from our building, in addition to being a result of an extremely active board of directors, is that we will then get to take many of their extremely informative seminars and subsequently compare notes, greatly increasing the amount of knowledge we bring back to our building collectively this year.

 

Local Law 11 and Leak Repair Work--Update

The board has selected the engineer who designed our new boiler to survey our building and create a standardized bid form for us to solicit bids from contractors to do our Local Law 11 2011 required work and repair select locations that have been found to be slowly leaking into a few 6th floor apartments. The report is expected this winter so that we may gather bids, pick a contractor, and have actual repairs begin in the Spring of 2011. In addition, we are asking this engineer to give us information about the load-bearing capacity of our roof so that we may plan to install a green roof within the next few years, should the roof be found to be capable of supporting the weight. In addition, as the final step of this repair work, we plan to paint our roof in super-reflective and insulating white-roof paint to reduce our upper-floor heat in the summer months.

 

Sprinkler System to Be Installed in Front Gardens

The board has approved funding for an in-ground sprinkler system to be installed in our street-side gardens to replace the make-shift hoses with punctures currently in use. As our garden committee continues to invest in multi-year plantings, we can help protect the value of those investments by keeping them appropriately hydrated so that they survive the hot and dry days of the summer months. The sprinkler heads will be custom-installed to spray water where needed, will retract into the ground when not in use, and will be operated on a timer, all of which should improve the efficiency of and reduce some of the costs of our current garden upkeep.

Enhanced by Zemanta

The opinions expressed here are those of the authors only. They do not necessarily reflect the positions or opinions of the 616 East 18 St. Owners Corporation, any of its staff members or residents, or Maxx Management.

This page is a archive of recent entries written by Andrew Merelis in November 2010.

Andrew Merelis: July 2010 is the previous archive.

Andrew Merelis: January 2011 is the next archive.

Find recent content on the main index or look in the archives to find all content.